Engineering

Arborview Boulevard Street Resurfacing Project

Skip Navigation LinksHome » Departments » Engineering » Arborview Boulevard Street Resurfacing Project
 

​​Project Limits

Ross Street to Miller Avenue

Timeline                  

Planning and Design: Winter 2021 – Spring 2022

Public Engagement: Winter 2022

Construction: Summer/Fall 2022

Why is this project being done?

  • Improve pavement conditions.

  • Upgrade certain stormwater system components.

  • Upgrade sidewalk ramps within the corridor.

  • Address objectives from the Ann Arbor Moving Together Toward Vision Zero Transportation Plan.

  • Address objectives identified through public engagement initiatives planned for the project. These initiatives will assist to guide the final scope determination and complete the design.

Work to be done

  • Full depth removal and replacement of the asphalt pavement to eliminate potholes, provide a smoother driving surface, and increase the service life of the street.

  • Replace stormwater curb drain inlets, segments of concrete curb and driveway openings, areas of concrete sidewalk and driveway approach aprons.

  • Upgrades or new installations of concrete sidewalk ramps (as required to meet current Americans with Disabilities Act standards).

  • Other work could be added to the project pending the outcome of public engagement initiatives. ​​

Costs and funding sources

City of Ann Arbor Bridge, Sidewalk and Street Millage and ACT 51 funds (Gas & Weight tax revenue) from the State of Michigan.

Public meetings, resources and documents

Feb. 17, 2022 virtual public meeting

Survey results summary​ (PDF)




 










E-mail picture

​Contact: