| Category |
Measure |
Program Requirements |
Market Rate Rebate** |
Income-Qualified Rebate** |
| All Rebates May Not Exceed 90% of Measure or Project Cost |
| Heat Pumps |
Cold Climate Heat Pump (Central or Mini-Split) |
Cold-Climate central ASHP and Cold-climate Mini-Spits: Must be listed on ashp.neep.org with a minimum SEER2 of 15.2 and HSPF2 of 8. Dual-fuel heat pumps are not eligible. Contractor installation, Manual J, and AHRI Certificate required. For centrally ducted systems, post-installation static pressure testing and documentation required. |
$4,000 |
$5,500 |
| Ductwork |
Ductwork for Centrally ducted CC ASHP |
Applicable to existing ductwork modifications only. Must modify ductwork to improve airflow and support proper heat pump operation within manufacturer static pressure specifications. Minor improvements such as duct sealing, taping, mastic application, or insulation alone are not eligible. Contractor installation, itemized invoice, before-and-after photos of modified ductwork, and post-installation static pressure testing required. |
$1,500 |
$2,500 |
| Water Heating |
Heat Pump Water Heater |
Must have a Uniform Energy Factor (UEF) of 2.0 or higher. Contractor installation required. |
$1,000 |
$2,000 |
| Cooking and Appliances |
Induction Cooktop or Range |
Must be at least 30 inches wide with four burners. Portable units are not eligible. |
$500 |
$750 |
| Heat Pump Dryer |
ENERGY STAR certified heat pump dryer. Must replace an existing dryer. |
$300 |
$500 |
| Electrical Upgrades |
Electric Panel Upgrade |
Replacement of main service panel (minimum 200A) or addition of sub-panel. Not eligible for new construction. Contractor installation required. |
$1,000 |
$2,000 |
| Battery Storage |
Battery Storage |
Battery storage must have capacity of at least 13 kWh. Contractor installation required. |
$2,000 |
$3,500 |
| E-Bike |
E-Bike |
UL 2849 certified. Motor ≤750W, not gas-powered. No retrofit kits. 3 wheels or less and have operable pedals. Includes all three classes. |
50% of bicycle cost, up to $250 |
50% of bicycle cost, up to $1,000 |
| Insulation |
Attic and Vaulted Ceiling* Insulation |
Minimum 500 sq. ft., R30 initial value or less, R49+ final value where physically feasible*. Contractor installation required. |
$500 |
$1,000 |
| Above-Grade Wall Insulation |
Minimum 250 sq. ft., R7 initial value or less, R13+ final value. Contractor installation required. |
$500 |
$1,000 |
| Crawl Space Insulation |
Minimum 100 sq. ft., R6 initial value or less, R10+ final value. Contractor installation required. |
$500 |
$1,000 |
| Rim/Band Joist Insulation |
Minimum 50 sq. ft., R0 initial value, R10+ final value with air sealing. Inadequate existing fiberglass batt insulation may be removed. Contractor installation required. |
$500 |
$1,000 |
| Basement Wall Insulation |
Minimum 200 sq. ft., R0 initial value, R10+ final value. Contractor installation required. |
$500 |
$1,000 |
| Air Sealing |
Air Sealing |
Pre- and post-blower door testing required. Must achieve at least a 20% reduction. Pre-and Post-CFM required. Contractor installation required. |
$500 |
$1,000 |
| Insulation + Air Sealing Bonus |
Combined Insulation & Air Sealing |
Complete two insulation measures and 20% air sealing to qualify. |
$1,500 |
$2,000 |