If approved, the Street, Bridge, and Sidewalk Repair and Replacement Millage would provide up to 2.125 mills from 2027 through 2032 to maintain and improve the City's existing transportation infrastructure.
Millage funds may be used to:
- Resurface or reconstruct existing City streets and bridges, including on street bicycle lanes and other nonmotorized transportation facilities.
- Construct, reconstruct, or improve pedestrian crosswalks.
- Construct or reconstruct accessible street crossings and corner ramps.
- Perform preventive maintenance that helps extend the useful life of existing paved streets and bridges.
- Repair or replace eligible sidewalks within the public right of way.
- Provide the City's local funding share for federally funded transportation projects, helping the City secure federal and state transportation grants.
How can the millage be used for sidewalks?
The millage primarily provides funding to repair and replace existing sidewalks. Outside the Downtown Development District (DDD), eligible sidewalk repairs are generally those adjacent to properties where the city levies property taxes. Within the DDD, the millage may be used for eligible sidewalks adjacent to single and two family homes where the city levies property taxes.
The City and Downtown Development Authority (DDA) may also enter into agreements that allow the city to perform sidewalk repairs within the DDD using funding provided by the DDA, as has occurred during the 2022 through 2026 millage period.
If the separate Construction of New Sidewalks Millage is not approved by voters, the Street, Bridge, and Sidewalk Millage could also be used for eligible new sidewalk construction that would not otherwise be funded through a special assessment.
During the current millage period, property owners outside the DDD have not been responsible for repairing sidewalks adjacent to their properties. City Code would need to be amended to continue this provision for the duration of the 2027 through 2032 millage.
Funds used for street and bridge work will be tracked and accounted for separately from funds used for sidewalk repairs.