Project ManagerChristopher Wall[email protected]734.947.2607 x43661
For updates Scio Church Road improvement project
Road construction and utility work complete
Sidewalk work Sept-Oct. 2023
Some existing water services and hydrants are on existing water mains that are too small and should not be used. These leads will be transferred to the newer and larger water main in the street. Additionally, the current condition of the pavement is poor and in need of replacement.
City Street, Bridge, and Sidewalk Millage, Federal Funding, Storm Utility Funds, and Drinking Water Funds will fund much of the work on this project. New sidewalks adjacent to taxable properties will be funded by the New Sidewalk Millage which was approved in the November 2020 election. This project is being partially funded through the MDOT Local Agency Program.
Feb. 2023 project engineering plans (PDF)