Update

Nov. 2​, 2018

The water main replacement and road resurfacing work on Pauline Blvd. is complete and the street is open for traffic. The remaining work includes touch up restoration and permanent p​avement markings. This will be done with flag people for traffic control, no street closures.  ​

​Timeline

Design: Summer - Fall 2017

Construction Schedule: Spring – September, 2018

Why is this project being done?

The current condition of the pavement on Pauline Blvd. between Stadium and Seventh is in poor condition and in need of replacement. In addition, the existing water main is undersized and requires an upgrade to increase capacity. 

Work to be done:

  • The existing water main will be replaced with a larger water main to increase capacity.
  • The existing pavement will be replaced.
  • Bump outs will be installed at Redeemer and Arbordale to improve pedestrian access.
  • Some curb, sidewalk and ramps will be replaced.

Possible impact to residents and/or businesses:

  • Pauline Blvd. will have temporary traffic control measures implemented during construction with traffic detours posted. Cross street traffic will be maintained as much as possible.
  • Water service will be interrupted for short durations during water main installation. Disruptions will be limited.
  • General noise and dust generated by excavation of the site and the equipment that must work in the area.

Costs and funding source

  • City Street Millage, Water Supply System Capital Budget and State Funding will fund work on this project

Public Engagement

TBA

Documents

Transportation Commission, CIP Committee, September 7, 2017

Public Meeting, October 12, 2017 

  


Project Manager:
Igor V. Kotlyar, P.E.  
301 E. Huron St., 4th Floor
Ann Arbor, MI 48107 
734.794.6410 ext. 43634 
ikotlyar@a2gov.org