Capital Improvements
FY2009-2014 Capital Improvements Plan








 Capital Improvements Plan 

 

The Municipal Planning Act (PA 285 of 1931) requires the planning commission of a city to annually prepare “coordinated and comprehensive programs of public structures and improvements.” It is the City Planning Commission's goal that the capital improvements plan (CIP) be used as a tool to implement the City Master Plan and assist in the City's financial planning. The Systems Planning Unit prepares the CIP for the City of Ann Arbor. 

The CIP outlines a schedule of public expenditures for a six-year period. It does not address all of the capital expenditures for the City, but provides for large, physical improvements that are permanent in nature that are needed for the functioning of the community, including transportation, parks, utilities, and municipal facilities improvements.

The CIP provides a list of high value capital budget items or projects for inclusion in the proposed Capital Budget or the proposed Operations and Maintenance (O & M) Budget of the City’s Annual Budget Document. 

Items to be included in the CIP typically are identified in one of three ways:

  • City master planning efforts, such as the Northeast Area Plan, Parks Recreation and Open Space Plan, or the City’s Non-Motorized Plan
  • Staff identification of needs through operations and maintenance of the City’s facilities and systems, such as water main breaks, bridge inspections, etc.
  • Citizen service requests, such as water main or sanitary sewer extensions. 

The CIP provides a methodology for turning these items into projects by outlining anticipated funding sources and schedules for study, design and/or construction of the solutions to the needs.

To qualify for inclusion in the CIP, a single project or a program of projects in a common infrastructure or capital system (e.g., neighborhood parks system; Annual Local Street Resurfacing Program, etc.) must meet the following standards:

  • Be consistent with 1) an adopted or anticipated component of the City master plan, 2) a state or federal requirement, or 3) a City Council approved policy; and
  • Constitute permanent, physical or system improvements in excess of $100,000; or significant equipment purchases in excess of $100,000 with a useful life of at least 10 years, or a study of at least $100,000 that will lead to such projects; and
  • Add to the value or capacity of the infrastructure of the City.

The Annual City Budget Document includes an Operations and Maintenance Expenditures Section and a Capital Expenditures Section. Projects that are considered operational, maintenance or recurring are excluded from the CIP but are captured in the O & M Budget portion of the Annual City Budget Document. Capital expenditures not meeting the CIP criteria are included in the annual budget as capital expenditures however they are not included in the CIP.

The Planning Commission and City Council seek public input during the preparation of the CIP through public hearings. Significant public involvement opportunities also are provided through master planning efforts, which occur before projects are included in the CIP, and during study and design of the projects after they have been included in the CIP. 

Plans in Place

Overview of the 2008-2013 Capital Improvements Plan (pdf) - Presentation to City Planning Commission on January 18, 2007

FY2008-2013 Capital Improvements Plan (pdf) - The CIP was adopted by the Planning Commission on January 18, 2007 and approved by  City Council on February 20, 2007.

FY 2009-2014 Capital Improvements Plan - The second-year update was approved by City Council on May 5, 2008.  The adjustments are summarized in the document below.  Links to the project descriptions may be found in the FY2008-2013 CIP.

Get Involved

For more information about the capital improvements planning process, contact Cresson Slotten, (734) 994-6156.

 

Updated September 2, 2008

This page is maintained by the Systems Planning Unit and is updated regularly.  If you experience any technical difficulties or have suggestions regarding this site, contact webmaster Wendy Rampson at wrampson@a2gov.org.

 

News

The FY 2009-2014 CIP was approved by City Council on May 5, 2008

>Learn more

 