Click to Skip Navigation
Skip Navigation LinksHome > Government > Public Services > Project Management > Future Capital Projects > Collingwood Dr., Dover Ct., and Ruthven Pl. Watermain Replacement Project
Skip navigation links
Project Management
Annual Street Resurfacing Program
Future Capital Projects
Private Development
Projects Under Construction
Seventh at Washington Pedestrian Refuge Island
Standard Specifications
Traffic Calming
Traffic Engineering
East Stadium Bridges Improvement Project
Sidewalk and Ramp Repair Program
Staff Directory
Street Millage






 Collingwood Dr., Dover Ct., and Ruthven Pl. Watermain Replacement Project 

 

Last Updated 4/20/11

Project Overview

The purpose of this project is to replace existing under sized water mains with a new 8-inch water main along the following streets: 

     Collingwood Dr. from Abbott Ave. to Fair St.

     Abbott Ave. from W Stadium Blvd. to just east of Pleasant Pl. 

     Dover Ct.

     Ruthven Pl.

The mains being replaced are insufficient in size, experience frequent breaks and do not provide adequate fire flow. Following the installation of the water main, the trenchs will be repaved and surrounding areas will be restored.

 

Schedule

Work on the project is scheduled to begin in June of 2011, and is anticipated to be complete in September 2011

 

Impact on Traffic & Local Residents

During construction, it will be necessary for our contractor to post temporary “No Parking” signs so that work can proceed in a timely manner. Access to driveways will be maintained during this time, with the exception of some short periods of time when the water main installation crosses in front of your driveway.  When this occurs, the contractor or a City representative will knock on residents’ doors to make sure the driveway does not need to be accessed during that time. 

Garbage collection and mail delivery will be maintained throughout the project. Water service will be maintained during construction, except for brief periods when the new water main is tied in to the existing main, and when house services are transferred to the new main.  Written notice will be given to residents two days before these shutoffs.

Unfortunately, the construction will generate dust and noise, and will cause some inconvenience.  We would like to thank you in advance for your patience and cooperation during the project.  

 

Progress Updates

Once construction is ready to begin, we will be sending out e-mail updates to anyone interested in receiving them.  If you would like to receive these progress/schedule updates, please send an e-mail to ikotlyar@a2gov.org and you will be added to the list.

 PROJECT COMPLETE

Questions or Concerns?

Contact

Igor Kotlyar, Project Engineer

734-794-6410 ext. 43634

E-mail: ikotlyar@a2gov.org

 