|
|
|
|
Homayoon Pirooz, P.E., Unit Manager
Employee Phone and e-mail Directory
Phone: 734-994-2744
After-Hours Emergencies: Dial 911
E-mail: projectmanagement@a2gov.org
The Project Management Unit is responsible for designing and constructing utility, roadway, and sidewalk projects; coordinating and inspecting the utility and public roadway work of developers; and optimizing traffic flow through the City. Feel free to contact us with any questions regarding our projects, or about utility locations and availability.
Maintenance requests (potholes, water main breaks, traffic signal and streetlight outages, damaged traffic signs, etc.) are now handled by the Customer Service Center at 734-994-2818. In case of emergency, please dial 911.
Interested in bidding on our projects? All of our projects are now posted through BidNet on the Michigan Inter-Governmental Trade Network (MITN) Web site.
Projects Under Construction
-
Huron River Drive Reopens Friday, Aug. 28 (PDF)
-
Temporary Traffic Control Plan in Effect Aug. 28, 2008, on Barton Drive Between Pontiac Trail and Traver Boulevard (PDF)
-
Temporary Traffic Control Plan in Effect Aug. 25 - Sept. 5, 2008, on Austin Avenue Between Norway and Wallingford (PDF)
-
Temporary Traffic Control Plan in Effect Aug. 22 - 26, 2008, on East Washington Between Fourth and Fifth Avenues (PDF)
-
Aug. 18 - Dec. 1, 2008, Temporary Traffic Control Plan in Effect on Huron Parkway Between Hubbard and Glazier (PDF)
-
Aug. 6 - 8, 2008, Temporary Traffic Control Plan in Effect on Huron Parkway Bridge (PDF)
-
Aug. 4, 2008, Temporary Traffic Control Plan in Effect at Newport and Sunset Roads (PDF) Map (PDF)
-
July 8 - 10, 2008, Temporary Traffic Control Plan on Huron Parkway Over Huron River and Geddes Avenue (PDF)
-
June 2 – Sept. 20, 2008, Huron River Drive closed to through-traffic from North Main Street to Maple Road
-
MDOT 2008 Washtenaw Avenue/Huron Street Resurfacing Project Begins May 28 (PDF)
-
Truck Traffic Restricted on South Main Street Beginning Week of May 19 (PDF)
-
Temporary Traffic Control Plan in Effect Beginning May 16: Washington Street from Division to State Streets and Division Street from Washington to Huron Streets (PDF) and Map 1 (PDF) and Map 2 (PDF)
-
Temporary Traffic Control Plan in Effect May 12 - July 1: Broadway Bridge Over Depot Street and Huron River (PDF) and Map (PDF)
-
Temporary Traffic Control Plan in Effect Tuesday, May 6 - Monday, July 14: North Maple Road, Between Dexter and Miller Avenues (PDF) and Map (PDF)
-
Temporary Traffic Control Plan in Effect Monday, May 5 - Friday, May 30: Washtenaw Avenue, from Berkshire Road to Vinewood Boulevard (PDF) and Map (PDF)
-
Temporary Traffic Control Plan in Effect Beginning Monday, May 5: Phase 1 - South State Street, Huron to Washington, and Phase 2 - East Washington Street, South State to Fletcher (PDF)
-
Temporary Traffic Control Plan in Effect Monday, April 28 to Thursday, May 8: North Maple and Dexter Avenue Intersection (PDF)
-
Temporary Traffic Control Plan in Effect Monday, April 28 to Friday, May 23: South Main Street at Eisenhower Parkway (PDF)
-
New Weight-limit Reductions Now in Effect for East Stadium Boulevard Bridge (PDF)
-
East Stadium Boulevard Bridge Weight-limit Reductions in Effect Beginning Jan. 1, 2008 (PDF)
Upcoming Projects
Traffic Engineering
Private Development & Annexations
Proposals
Annual Street Resurfacing Program
· Street Selection Procedure
· Street Condition Reporting Procedure
· 2008 Street Resurfacing Project
|
|
|